Rig “Jaya” alongside
The semi-submersible drilling rig was offloaded from the heavy lift vessel Hua Hai Long over the weekend off the port of Walvis Bay and maneuvered alongside at berth number seven in the port, where it will stay for several weeks for repair and maintenance work. The rig’s arrival means an economic injection for the harbour town’s struggling marine industrial and ship repair sector.
You must be logged in to post a comment Login